Arık, O. A. (2019). Credibility based chance constrained programming for project scheduling with fuzzy activity durations. An International Journal of Optimization and Control: Theories & Applications (IJOCTA), 9(2), 208–215. https://doi.org/10.11121/ijocta.01.2019.00631