[1]
Arık, O.A. 2019. Credibility based chance constrained programming for project scheduling with fuzzy activity durations. An International Journal of Optimization and Control: Theories & Applications (IJOCTA). 9, 2 (Apr. 2019), 208–215. DOI:https://doi.org/10.11121/ijocta.01.2019.00631.