[1]
Demir, H.I. and Canpolat, O. 2017. Integrated process planning, WSPT scheduling and WSLK due-date assignment using genetic algorithms and evolutionary strategies. An International Journal of Optimization and Control: Theories & Applications (IJOCTA). 8, 1 (Dec. 2017), 73–83. DOI:https://doi.org/10.11121/ijocta.01.2018.00412.